The efficient dealing with the dynamic environment of production industries is one of the most challenging tasks of Supply Chain Management in high-wage countries. Relevant and current information are still not used sufficiently, to handle the influence of the dynamic environment on intra- and inter-company order processing adequately. Among other things, the problem is caused by missing or delayed feedback of relevant data. As a consequence of that, planning results differ from the actual situation of production. High Resolution Supply Chain Management describes an approach aiming on high information transparency in supply chains in combination with decentralized, self-optimizing control loops for Production Planning and Control. The final objective is to enable manufacturing companies to produce efficiently and to be able to react to order-variations at any time, requiring process structures to be most flexible.
Manufacturing companies of the machinery and equipment industry find themselves more than ever exposed to a rapidly changing competitive environment. In particular, the resulting diversity of planning and control processes confronts organisations and information systems with a significant coordination effort. To this day, planning and execution of order processing – from offer processing to the final shipment of the product – is still a part of the production planning and control (PPC), which is almost entirely integrated into information systems. Though, in order to manage dynamic influences on processes within order processing, there can be found a deficiency in the processing of decision-relevant and real-time information. Partly, the reason for this is a missing or incorrect feedback of process relevant data, so that the planning results, gained by the use of information systems, differ to the current process situation.
The concept of Manufacturing Resource Planning (MRP II) still represents the central logic of production planning and control. However, the centralised and push-oriented MRP II planning logic is not able to plan and measure dynamic processes adequately, which, due to diverse disturbances, often occur in production environments. Furthermore, specific weaknesses of MRP II-based systems are the lack of support for order releases, the planning principle based on average values and the successive planning method as well as the use of limited partial models. As a result a successive planning method leads to a dissection of PPC-tasks into smaller work packages and so strides away from a holistic approach and the achievement of an optimal solution. Similarly, a planning, focusing on a general business objective system, using a partial planning approach due to isolated considerations is not possible. Insufficient consideration of the current load horizon and the current capacity utilization, non-existing or delayed feedback on order progress as well as faults and poor availability and transparency of information can be named as further weaknesses of MRP II-based systems.
Nowadays one of the most challenging tasks of producing companies is the growing complexity due to the globalization and digitalization. Especially in high wage countries, the ability to deliver fast and to a fixed date gets more and more important. To achieve this logistic target, it is necessary to optimize the Production Planning and Control (hereinafter PPC). This study investigates the effects of a change of the scheduling parameters on a target system. The focused research questions are: How can the effect of a scheduling parametersvariation on the target system of the PPC can be displayed efficiently? Is it possible to review the effect of the scheduling parameters-variation quantitatively and to derive action options?