Refine
Year of publication
Document Type
- Conference Proceeding (106)
- Part of a Book (13)
- Contribution to a Periodical (5)
- Article (3)
- Lecture (2)
Language
- English (129) (remove)
Is part of the Bibliography
- no (129)
Keywords
- 02 (11)
- 03 (10)
- 04 (1)
- 5G (2)
- AI (2)
- APMS (1)
- APS (1)
- Adaptability (1)
- Advanced Planning System (1)
- Anomaly detection (1)
Institute
Within each of the three design fields numerous design elements exist (e.g. degree of centralization, number of warehouses etc. in the field network design). Hence, the interdependencies of all design elements have to be analyzed to allow optimal decisions for the design of an efficient and effective spare parts logistics. Nevertheless, the complexity among all interdependencies can hardly be understood. Therefore it is necessary to reduce the complexity of design decisions by focusing on the most important design elements according to the logistical requirements of different spare part categories. In order to achieve this goal, a classification of spare parts in terms of their key characteristics has been developed. For different spare part categories only a smaller set of design elements and their interdependencies has to be taken into account. The reduced number of key design elements per spare part category can be analyzed and understood in depth. Thus a Systems Dynamics approach is used to allow a better configuration of network design, cooperation concepts and inventory management in spare parts Supply Chains on the basis of specific logistics requirements of different spare part categories.
In dynamic markets flexible and efficient production systems are the main success factor for companies. The production system in this context includes all five phases of the SCOR-Model: Source, Make, Deliver, Plan and Return. In a subproject of the cluster of excellence "Integrative Production Technology for High-Wage Countries" at RWTH Aachen University, a configuration logic is being developed that enables companies to configure their production system according to the dynamic requirements of the market. As a major intermediate result, a holistic description model for production systems has been defined. In combination with numerous attributes in the sub-models, a detailed characterization of the production system is possible.
The sub-model for the design of the Supply Chain (mainly Deliver) will be depicted in detail in this paper. Representative for the design of a Supply Chain, spare parts logistics - as one of the most challenging tasks in logistics planning - is analyzed in depth. For this purpose spare parts logistics is divided into three design fields: network design, cooperation concepts (e.g. with logistics providers, customers, suppliers) and inventory management. Decisions in the design fields are highly interdependent, any spare parts logistics configuration has to take these interdependencies into account.
In a subproject of the cluster of excellence “Integrative Production Technology for High-Wage Countries” at RWTH Aachen University a configuration logic is under development that enables companies to configure their production system according to the dynamic requirements of the market. As a result of this project, a holistic description model for production systems has been defined. With numerous attributes in the sub-models a detailed characterization of the production system is possible.
The sub-model for the design of the supply chain will be depicted in detail in this paper. Representative for the design of a supply chain, the spare parts logistics of the wind energy industry is analyzed in depth. Designing this supply chain is not only one of the most challenging tasks in logistics. Only a responsive but also cost efficient design of the spare parts supply chain guarantees high productivity, extended life spans of the wind turbines as well as the expected profit for all companies in the supply chain.
Industrial companies face tremendous challenges to plan the resources needed to meet future market demands when implementing a PSS based solution portfolio. This paper deals with enhancing the PSS research landscape by presenting an approach to enable better resource-planning in PSS based businesses. In particular, a model is proposed which links resource structures with customer offerings. Linkages are implemented, which connect resources and their use in processes. The model contributes to better understand the complexity in resource structures and elements in the PSS and helps to better understand and describe the structural integration of resources in PSS. This is an important prerequisite for the planning of PSS and allows a qualitative and quantitative description of the service resources allocation enabling companies to build the competence needed to meet customer requirements. A case study based approach was applied for model development.
One of the central success factors for production in high-wage countries is the solution of the conflict that can be described with the term “planning efficiency”. Planning efficiency describes the relationship between the expenditure of planning and the profit generated by these expenditures. From the viewpoint of a successful business management, the challenge is to dynamically find the optimum between detailed planning and the immediate arrangement of the value stream. Planning-oriented approaches try to model the production system with as many of its characteristics and parameters as possible in order to avoid uncertainties and to allow rational decisions based on these models. The success of a planning-oriented approach depends on the transparency of business and production processes and on the quality of the applied models. Even though planning-oriented approaches are supported by a multitude of systems in industrial practice, an effective realisation is very intricate, so these models with their inherent structures tend to be matched to a current stationary condition of an enterprise. Every change within this enterprise, whether inherently structural or driven by altered input parameters, thus requires continuous updating and adjustment. This process is very cost-intensive and time-consuming; a direct transfer onto other enterprises or even other processes within the same enterprise is often impossible. This is also a result of the fact that planning usually occurs a priori and not in real-time. Therefore it is hard for completely planning-oriented systems to react to spontaneous deviations because the knowledge about those naturally only comes a posteriori.
Manufacturing companies of the machinery and equipment industry find themselves more than ever exposed to a rapidly changing competitive environment. In particular, the resulting diversity of planning and control processes confronts organisations and information systems with a significant coordination effort. To this day, planning and execution of order processing – from offer processing to the final shipment of the product – is still a part of the production planning and control (PPC), which is almost entirely integrated into information systems. Though, in order to manage dynamic influences on processes within order processing, there can be found a deficiency in the processing of decision-relevant and real-time information. Partly, the reason for this is a missing or incorrect feedback of process relevant data, so that the planning results, gained by the use of information systems, differ to the current process situation.
The concept of Manufacturing Resource Planning (MRP II) still represents the central logic of production planning and control. However, the centralised and push-oriented MRP II planning logic is not able to plan and measure dynamic processes adequately, which, due to diverse disturbances, often occur in production environments. Furthermore, specific weaknesses of MRP II-based systems are the lack of support for order releases, the planning principle based on average values and the successive planning method as well as the use of limited partial models. As a result a successive planning method leads to a dissection of PPC-tasks into smaller work packages and so strides away from a holistic approach and the achievement of an optimal solution. Similarly, a planning, focusing on a general business objective system, using a partial planning approach due to isolated considerations is not possible. Insufficient consideration of the current load horizon and the current capacity utilization, non-existing or delayed feedback on order progress as well as faults and poor availability and transparency of information can be named as further weaknesses of MRP II-based systems.
Remote services are services enabled by information and communication components and therefore do not require the physical presence of a service technician at the service object to provide a task. The impact of remote service on the capital goods industry has been increasingly significant over the recent yeas. Still many companies struggle with developing and implemenling successful business model, for remote service. This leads to a lot of unaccomplished benefits for the customer as well as for the companies themselves. A survey throughout companies in Ihe industrial machine and plant production sector was conducted in order to determine what successful companies do differently from those that cannot efficiently implement remote service business models.
The study presented in this chapter identifies key suceess factors of companies that effectively implemented remote services for their products. In order to identify the successful companies a scale for measuring remote service success was developed. Only by the use of this scale further findings regarding the success factors were possible. Key findings include the fact that successful companies actively market their remotle service to their customers. Generally they try to approach their remote service business from the operating company's perspective.
Industrial production in high-wage countries like Germany is still at risk. Yet, there are many counter-examples in which producing companies dominate their competitors by not only compensating for their specific disadvantages in terms of factor costs (e.g. wages, energy, duties and taxes) but rather by minimising waste using synchronising integrativity as well as by obtaining superior adaptivity on alternating conditions. In order to respond to the issue of economic sustainability of industrial production in high-wage countries, the leading production engineering and material research scientists of RWTH Aachen University together with renowned companies have established the Cluster of Excellence “Integrative Production Technology for High-Wage Countries”. This compendium comprises the cluster’s scientific results as well as a selection of business and technology cases, in which these results have been successfully implemented into industrial practice in close cooperation with more than 30 companies of the industrial production sector.
Companies in high wage countries are increasingly confronted with the challenge of optimizing economies of scope and economies of scale simultaneously to succeed on a global market place. An integrated assessment of production systems facing this challenge is essential to evaluate the actual state of a company and to provide a basis for drawing the right conclusions to reconfigure production systems successfully.
In this paper an integrated model for measuring economies of scope as well as economies of scale is introduced, defining the fundamental domains of a production system. The major objectives resulting from the overall scale-scope dilemma are broken down for each domain and the main dimensions for an assessment of each domain are defined. A new measure named Degree of Efficiency is defined, quantifying the fulfillment of the opposing objectives in each domain and hence, the contribution to an overall resolution of the scale-scope dilemma.
The efficient dealing with the dynamic environment of production industries is one of the most challenging tasks of Supply Chain Management in high-wage countries. Relevant and current information are still not used sufficiently, to handle the influence of the dynamic environment on intra- and inter-company order processing adequately. Among other things, the problem is caused by missing or delayed feedback of relevant data. As a consequence of that, planning results differ from the actual situation of production. High Resolution Supply Chain Management describes an approach aiming on high information transparency in supply chains in combination with decentralized, self-optimizing control loops for Production Planning and Control. The final objective is to enable manufacturing companies to produce efficiently and to be able to react to order-variations at any time, requiring process structures to be most flexible.
Maximising economies of scale in individualised production is a vital issue for producing companies in high wage countries. A decisive enabler for this is the management of product and process complexity by systematic standardisation. Due to the strong and far-reaching impact of complexity on the value added chain, its management requires an integrative consideration of the entire product and production system.
The following paper introduces a methodology facing this challenge. The core element of this methodology is an integrative and complexity-focused assessment model. This assessment model has been validated experimentally by analysing key company data from more than 50 German toolmaking firms. Findings of this empirical investigation are presented in this paper.