Refine
Year of publication
Document Type
- Article (3)
- Part of a Book (12)
- Conference Proceeding (105)
- Contribution to a Periodical (3)
- Lecture (2)
Language
- English (125) (remove)
Is part of the Bibliography
- no (125)
Keywords
- 02 (11)
- 03 (9)
- 04 (1)
- 5G (2)
- AI (2)
- APMS (1)
- APS (1)
- Adaptability (1)
- Advanced Planning System (1)
- Anomaly detection (1)
Institute
Industrial companies face tremendous challenges to plan the resources needed to meet future market demands when implementing a PSS based solution portfolio. This paper deals with enhancing the PSS research landscape by presenting an approach to enable better resource-planning in PSS based businesses. In particular, a model is proposed which links resource structures with customer offerings. Linkages are implemented, which connect resources and their use in processes. The model contributes to better understand the complexity in resource structures and elements in the PSS and helps to better understand and describe the structural integration of resources in PSS. This is an important prerequisite for the planning of PSS and allows a qualitative and quantitative description of the service resources allocation enabling companies to build the competence needed to meet customer requirements. A case study based approach was applied for model development.
Industrial Service Providers (ISP) are exposed to constantly raising competitive pressures regarding both cost and performance aspects. The massive challenges caused by the current worldwide financial and economic crisis even intensified the need for process optimizations aimed at increasing the productivity of service production. To reach this goal the evaluation and elimination of waste in their production processes becomes a crucial ability for ISPs. This paper proposes a new approach for increasing productivity in service production processes using a generic measurement model for the detection and evaluation of waste. The model is based on established lean management principles, but tailored to the specifics of ISPs by adopting a customers’ perspective to track down and eliminate waste. The evaluation builds on an in-depth-analysis of particular types of waste in the industrial service production processes. Viewed from the customers’ perspective and taking into account the specific characteristics of services (e.g. intangibility, heterogeneity, inseparability, and perishability) and service production (e.g. volatile demand, a tendency to over-capacity, and limits to planning) the approach employs a service blueprint reference model to then determine the different types of waste in the various parts of the service production process.
In the near future, tooling companies will offer their customers not just maintenance services, but complex remote service packages for their engineering asset management, which is the total management of physical – not financial – assets. The overall goal is to enhance the efficiency of the engineering asset, e.g. to reduce TCO, on the customers´ site by means of value creating partnerships. These partnerships may be, e.g. the classical output or reliability partnership, but also process optimizing partnerships or lifecycle partnerships. The process optimizing partnership offers, e.g. the optimization of the system’s performance or the output quality, an optimized ramp-up and restart procedure or optimization of the production process parameters. The lifecycle partnership, on the other hand, accompanies the intelligent tool-machine-system throughout the whole lifecycle, which includes, e.g. provision of spare parts during the entire usage phase, storing, refurbishment, recycling and even the support of relocation of production facilities. Intelligent remote services have great potential for realizing all these partnerships.
To realize such engineering asset-related partnerships, two major tasks have to be done. First, there has to be the intelligent tool-machine system, which delivers the information that is required for these services. And furthermore, this information has to be integrated into the maintenance processes, so that it is delivered at the right place and time and in the required form. Second, the activities and processes that are combined to the engineering asset-related partnerships have to be configured out of standardized service and process modules. Therefore configuration logic is essential.
Rebound Logistics
(2009)
Today, the flow of product returns is becoming a significant concern for many manufacturing companies. In this research area, three fundamental aspects of product returns need to be taken into consideration: First, companies become increasingly aware of the fact that product returns may offer an opportunity for enormous profit generation and for improving the competitive advantage of a manufacturing company when taking into account the accretive value of the products and technology. Second, the impact of green laws, legislative provisions and the increasing impact of a sustainable production management due to marketing aspects force companies to design and manage the reverse supply chain actively. Third, the importance of managing the reverse supply chains effectively will be enforced by the currently volatile economic climate. This paper outlines first results of designing a methodological framework for implementing an integrative reverse supply chain for manufacturing companies based on a type-specific Reverse Supply Chain Reference Model.
The House of Maintenance
(2009)
In order to guarantee an efficient and effective employment of production equipment, it is essential to identify any possible potential for improving performance, not only in the production process, but also in supporting areas such as maintenance. One of the major tasks in increasing maintenance performance consists of systematically identifying the company’s most significant weaknesses in maintenance organisation and thus being able to implement improvements there where they are most needed.
But how is a company to tackle this important task? To answer this question, this paper describes an assessment and improvement approach, based on a capability maturity model (CMM). By means of this approach, the status-quo of a maintenance organisation can be analysed and its individual improvement opportunities identified.
Due to shorter product life cycles the number of production ramp-ups is increasing, while customers have a soaring demand for more variable and individualized products. In the future, optimizing the production ramp-up will become an important differentiation criterion for companies. Considering the whole supply chain in the ramp-up process becomes therefore indispensable. This is what the presented research in this paper concentrates on. The intention of the research project is to develop a model of a supply chain in the production ramp-up stage. Through this model, approaches for optimizing the production ramp-up in the whole supply chain will be derived.
Further the research project concentrates on measuring the production ramp-up performance in the supply chain, showing the impact on economic and financial measures. The result of this research is an approach to align the tasks and objectives of Supply Chain Management with the tasks and objectives of ramp-up management in order to optimize the whole supply chain in the ramp-up stage.
The Aim of this article is to provide a framework which enhances the existing scope of manufacturing asset management by specifically addressing industrial services provided by external suppliers as an integral part of today’s manufacturing structures. Existing research shows that sourcing industrial services from specialized service organizations establishes complex and unique interdependencies and links total production efficiency to the performance of the external service suppliers. Within the context of the EU-Project InCoCo-S - “Innovation, Coordination and Collaboration in Service Driven Manufacturing Supply Chains” a standard business reference model with key focus on operation and integration of business related services (BRS) in the supply chain has been developed. Based on the service type retrofit this paper aims on the one hand to present the modules of the reference model and on the other hand to explain how the model can be used to enhance the retrofit business.
Outsourcing of logistics operations (especially transportation, distribution & warehousing) is one of the most viable options exercised by the customers to excel in their logistic operations. Despite the growing outsourcing of logistics services to 3PL providers, both the service providers & their customers are facing tremendous problems in synchronizing the business processes & analyzing the performance using common key performance indicators. There is a huge demand for an integrated approach to help 3PL and their customers better synchronize their business processes and have common goals & perspectives. Such integrated approaches often take shape of a process oriented reference model covering many diverse aspects related to the operations & controlling of any business. In this paper, an integrated reference model to support 3PL service operations is presented. The Logistics Reference Model (LRM) developed & validated in some 3PL service companies encompasses standard business processes, performance measurement system and best practices.
In most European countries a structural change from a production dominated towards a service oriented society is progressing. Companies increasingly consider services as means to gain competitive advantages in a global competition. In order to provide holistic, value-adding solutions while simultaneously guaranteeing high quality standards, production companies increasingly join forces with external services‘ providers. Models, methods and tools for service development are rare and in most cases immature. In the context of virtual services‘ development this leads to a dual set of simultaneous chal-lenges: an alignment of systematic services‘ and product development and the coordination of distributed R&D partners. The objective is to provide a meta-process that identifies all steps and decision points necessary to successfully develop innovative services. It is a result of combined service development and virtual enterprises‘/ networks‘ research.
In a subproject of the cluster of excellence “Integrative Production Technology for High-Wage Countries” at RWTH Aachen University a configuration logic is under development that enables companies to configure their production system according to the dynamic requirements of the market. As a result of this project, a holistic description model for production systems has been defined. With numerous attributes in the sub-models a detailed characterization of the production system is possible.
The sub-model for the design of the supply chain will be depicted in detail in this paper. Representative for the design of a supply chain, the spare parts logistics of the wind energy industry is analyzed in depth. Designing this supply chain is not only one of the most challenging tasks in logistics. Only a responsive but also cost efficient design of the spare parts supply chain guarantees high productivity, extended life spans of the wind turbines as well as the expected profit for all companies in the supply chain.
More and more companies in the mechanical and plant engineering industry are transforming their business model and evolving from product to solution providers. Subscription business models play a key role in this development. They enable companies to enter long-term collaborative relationships with customers and thus monetize the potential of Industry 4.0. However, this development is not easy for many companies and is associated with numerous hurdles. One of these hurdles is the development of a suitable range of services tailored to customer needs. In this context, the bundling of individual services to service modules plays a key role in realizing new value propositions. In practice, however, companies often lack an understanding of which services need to be combined in what way to be able to realize new value propositions. Accordingly, the goal of this work is to identify relevant services for subscription business models, to cluster them into meaningful value-adding bundles, and to derive new value propositions accordingly. The new value propositions in turn enable mechanical and plant engineering companies to strengthen customer loyalty and thus achieve long-term economic success.
Within each of the three design fields numerous design elements exist (e.g. degree of centralization, number of warehouses etc. in the field network design). Hence, the interdependencies of all design elements have to be analyzed to allow optimal decisions for the design of an efficient and effective spare parts logistics. Nevertheless, the complexity among all interdependencies can hardly be understood. Therefore it is necessary to reduce the complexity of design decisions by focusing on the most important design elements according to the logistical requirements of different spare part categories. In order to achieve this goal, a classification of spare parts in terms of their key characteristics has been developed. For different spare part categories only a smaller set of design elements and their interdependencies has to be taken into account. The reduced number of key design elements per spare part category can be analyzed and understood in depth. Thus a Systems Dynamics approach is used to allow a better configuration of network design, cooperation concepts and inventory management in spare parts Supply Chains on the basis of specific logistics requirements of different spare part categories.
In dynamic markets flexible and efficient production systems are the main success factor for companies. The production system in this context includes all five phases of the SCOR-Model: Source, Make, Deliver, Plan and Return. In a subproject of the cluster of excellence "Integrative Production Technology for High-Wage Countries" at RWTH Aachen University, a configuration logic is being developed that enables companies to configure their production system according to the dynamic requirements of the market. As a major intermediate result, a holistic description model for production systems has been defined. In combination with numerous attributes in the sub-models, a detailed characterization of the production system is possible.
The sub-model for the design of the Supply Chain (mainly Deliver) will be depicted in detail in this paper. Representative for the design of a Supply Chain, spare parts logistics - as one of the most challenging tasks in logistics planning - is analyzed in depth. For this purpose spare parts logistics is divided into three design fields: network design, cooperation concepts (e.g. with logistics providers, customers, suppliers) and inventory management. Decisions in the design fields are highly interdependent, any spare parts logistics configuration has to take these interdependencies into account.
The mechanical and plant engineering industry faces a stagnation in the new machinery market and is relying on innovative business models such as subscription to overcome these. In this business model, individually customized solution packages are offered. The success of these models depends directly on the future success of the customer, making the selection of the right customers crucial. The aim of this paper is to identify the criteria that indicate the suitability of customers for subscription models. While there are individual descriptions of suitability criteria in the existing literature, there is a lack of comprehensive consideration of customer relationship, customer company, and customer market, as the extensive consideration was not necessary in the transactional sale of machines until now. Therefore, in this study, expert interviews are conducted with companies in mechanical and plant engineering that offer subscription models. The results show criteria that are used to evaluate customers in the six main categories of creditworthiness, market potential, benefit potential, feasibility, relationship, and sales effort. In total, 24 criteria can provide insight into the suitability of the customer for a successful subscription relationship. These criteria are intended to develop target systems that meet the requirements of different stakeholders in the customer and thus support the economic viability of these business models.
The adoption of artificial intelligence (AI) technologies in manufacturing companies is challenging, particularly for SMEs that lack the necessary skills to develop and integrate AI-based applications (AI applications) into their existing IT system landscape. To address this challenge, the research project VoBAKI (IGF-Project No.: 22009 N) aims to enable SMEs to identify and close skill gaps related to AI application development and implementation using proper sourcing strategies. This paper presents the interim results from the second phase of the project, which involves identifying the tasks in the lifecycle of AI applications and determining the specific skills required for executing these tasks. The presented results provide a detailed lifecycle including the phases for the development and usage of AI applications, as well as the specific tasks that SMEs must consider when implementing an AI application. These results serve as the foundation for future research regarding the required skills to execute the presented tasks and provide a roadmap for SMEs to close skill gaps and successfully implement AI applications.
Die Herausforderungen der Zukunft werden geprägt durch digital veredelte Produkte von höchster Qualität und hoher Variantenvielfalt bei gleichzeitig kleiner werdenden Losgrößen. Konventionelle Entwicklungsmethoden stoßen aufgrund zunehmender Komplexität und kürzer werdender Lebenszyklen auf Produktebene an ihre Grenzen. Dadurch werden bei kundenindividueller Produktion die Aufwände in der Arbeitsplanung und -vorbereitung überproportional größer. Eine mögliche Lösung stellt die generative Erstellung der Produktionsstückliste während der Montage dar. Durch das eventbasierte „Mitschreiben der Montage“ werden administrative und planungsintensive Prozesse in der Arbeitsvorbereitung überproportional reduziert und die Erstellung der Stückliste in die manuelle Montage transferiert.