Refine
Year of publication
Document Type
- Conference Proceeding (82)
- Article (6)
- Part of a Book (3)
- Contribution to a Periodical (3)
- Book (1)
- Lecture (1)
- Preprint (1)
- Working Paper (1)
Language
- English (98) (remove)
Is part of the Bibliography
- no (98)
Keywords
- 02 (15)
- 03 (4)
- 3GPP (1)
- 5G (5)
- 5G mobile communication (2)
- 5G use case (1)
- 5G-Mobilfunk (1)
- 5G-Technology (1)
- AI (2)
- Adaptability (1)
Institute
Electricity generated by wind turbines (WT) is a mainstay of the transition to renewable energy. In order to economically utilize WT is, operating and maintenance costs, which account for 25% of total electricity generation costs in onshore WT’s, are a focus of cost reduction activities. Implementing a data-driven prescriptive maintenance approach is one way to achieve this. So far, various approaches for prescriptive maintenance for onshore WT’s have been suggested.
However, little research has addressed the practical implementation considering sociotechnical aspects. The aim of this paper is therefore to identify success factors for the successful implementation of such a maintenance strategy with clear and holistic guidance on how existing knowledge on prescriptive maintenance from science can be transferred to business practice. These recommendations are developed through case study research and classified in the four structural areas of Acatech’s Industry 4.0 Maturity Index: Resources, Information Systems, Organizational Structure and Culture.
Since 2016, the “Digital in NRW” Competence Centre has been supporting SMEs in the manufacturing industry in designing their individual digital transformation. With an Industry 4.0 maturity assessment, we define the status quo of SMEs, derive SME-specific measures from this, develop a digitalization roadmap and accompany the SME transformation. This paper presents the results of the four-year SME support. By analyzing the results of all maturity assessments, potential analysis and design workshops, we present the most frequent and most effective measures for a successful digital transformation of SMEs. The result of the paper is an action guideline for SMEs to initiate their own digital transformation based on formalized experience.
With big data-technologies on the rise, new fields of application appear in terms of analyzing data to find new relationships for improving process under-standing and stability. Manufacturing companies oftentimes cope with a high number of deviations but struggle to solve them with less effort. The research project BigPro aims to develop a methodology for implementing counter measures to disturbances and deviations derived from big data. This paper proposes a methodology for practitioners to assess predefined counter measures. It consists of a morphology with several criterions that can have a certain characteristic. Those are then combined with a weighting factor to assess the feasibility of the counter measure for prioritization.
Industrie 4.0 is changing the industrial landscape in an unanticipated way. The vision for manufacturing industries is to transform to an agile company, in order to react on occurring events in real-time and make data based decisions. The realization requires also new capabilities for the information management. To achieve this goal agile companies require taking measured data, analyzing it, deriving knowledge out of this and support with the knowledge their employees. This is crucial for a successful Industrie 4.0 implementation, but many manufacturing companies struggling with these requirements. This paper identifies the required capabilities for the information management to achieve a successful Industrie 4.0 implementation. [https://link.springer.com/chapter/10.1007/978-3-319-65151-4_3]
Increasing the energy efficiency and meanwhile avoiding unplanned maintenance breaks are keys for manufacturing companies to stay competitive in the future. This paper presents an energy saving and maintenance cost reducing approach for manufacturing environments. The approach describes first occurring types of energy wastage within manufacturing and characterizes them in more detail. Including additional external information, the significance of an identified on-going wastage can be determined. Based on the type of wastage and the significance; concrete recommendations for measures to prevent the wastage are delivered. The identified wastage facilitates detecting inefficient operating mode as well as wearing and malfunctioning at machines. By using complex event processing technologies realtime information can forwarded directly to the responsible persons to enable quick reactions to prevent energy wastage and unplanned downtimes. The paper presents an approach to identify detection and propose concepts for manufacturing enterprises. The information processing procedure is used for the implementation of two Use Cases.
Viable Production System for adaptable and flexible production planning and control processes
(2009)
High Resolution Supply Chain Management (HRSCM) aims at designing adaptable and flexible production planning and control (PPC) processes according to the needs of the company’s supply chain environment. To reach this goal a model for a Viable Production System (VPS) has been elaborated and is presented in this paper. Based on the Viable System Model (VSM) developed by Stafford Beer current production systems are analyzed in terms of integrity. With the gained knowledge a complete recursive framework of a VPS is developed. The framework allows the design of a decentralized production system that meets all requirements of a dynamic environment. Flexible and adaptable PPC processes can be developed for each identified subsystem of the VPS. Hence, further research focuses on the development of process and control loops in order to assure the application of the framework. Exemplarily the decentralised control loop for inventory management is elaborated in a case study.
[Study] Blockchain
(2019)
Distributed ledger technologies, of which the best known example is blockchain, were expected to make their big breakthrough in 2018. Instead, the opposite happened. Cryptocurrency price slumps and delays in promising projects became symptoms of a new sense of caution. Organizations tried to use blockchain in unsuitable applications, and underestimated implementation hurdles. Despite this, the need for effective data exchange and data management in today's connected world remains high. Decentralized solutions, intelligent sensors, global supply chains and vast quantities of customer data will further stimulate demand for specialized and powerful data management systems. Blockchain therefore remains one option to enable a secure and interconnected world. The following five-step approach will help you harness blockchain's potential, avoiding common mistakes and overcoming implementation hurdles on your way.
Influenced by the high dynamic of the markets the optimization of supply chains gains more importance. However, analyzing different procurement strategies and the influence of various production parameters is difficult to achieve in industrial practice. Therefore, simulations of supply chains are used in order to improve the production process. The objective of this research is to evaluate different procurement strategies in a four-stage supply chain. Besides, this research aims to identify main influencing factors on the supply chain’s performance. The performance of the supply chain is measured by means of back orders (backlog). A scenario analysis of different customer demands and a Design of Experiments analysis enhance the significance of the simulation results.
Influenced by the high dynamic of the markets and the steadily increasing demand for short delivery times the importance of supply chain optimization is growing. In particular, the order process plays a central role in achieving short delivery times and constantly needs to evaluate the trade-off between high inventory and the risk of stock-outs. However, analyzing different order strategies and the influence of various production parameters is difficult to achieve in industrial practice. Therefore, simulations of supply chains are used in order to improve processes in the whole value chain. The objective of this research is to evaluate two different order strategies (t, q, t, S) in a four-stage supply chain. In order to measure the performance of the supply chain the quantity of the backlog will be considered. A Design of Experiments approach is supposed to enhance the significance of the simulation results.
Failure management in the production area has been intensely analyzed in the research community. Although several efficient methods have been developed and partially successfully implemented, producing companies still face a lot of challenges. The resulting main question is how manufacturers can be assisted by a sustainable approach enabling them to proactively detect and prevent failures before they occur. A high-resolution production system based on analyzed real-time data enables manufacturers to find an answer to the main question. In this context, Big Data technologies have gained importance since the critical success factor is not only to collect real-time data in the production but also to structure the data. Therefore, we present in this paper the implementation of Big Data technologies in the production area using the example of an actual research project. After the literature review, we describe a Big Data based approach to prevent failures in the production area. This approach mainly includes a real-time capable platform including complex event processing algorithms to define appropriate improvement measures.