Refine
Year of publication
Document Type
- Conference Proceeding (105) (remove)
Language
- English (105) (remove)
Is part of the Bibliography
- no (105)
Keywords
- 02 (9)
- 03 (9)
- 04 (1)
- 5G (2)
- AI (2)
- APMS (1)
- APS (1)
- Advanced Planning System (1)
- Anomaly detection (1)
- Architektur <Informatik> (1)
Institute
Maximising economies of scale in individualised production is a vital issue for producing companies in high wage countries. A decisive enabler for this is the management of product and process complexity by systematic standardisation. Due to the strong and far-reaching impact of complexity on the value added chain, its management requires an integrative consideration of the entire product and production system.
The following paper introduces a methodology facing this challenge. The core element of this methodology is an integrative and complexity-focused assessment model. This assessment model has been validated experimentally by analysing key company data from more than 50 German toolmaking firms. Findings of this empirical investigation are presented in this paper.
Manufacturing companies of the machinery and equipment industry find themselves more than ever exposed to a rapidly changing competitive environment. In particular, the resulting diversity of planning and control processes confronts organisations and information systems with a significant coordination effort. To this day, planning and execution of order processing – from offer processing to the final shipment of the product – is still a part of the production planning and control (PPC), which is almost entirely integrated into information systems. Though, in order to manage dynamic influences on processes within order processing, there can be found a deficiency in the processing of decision-relevant and real-time information. Partly, the reason for this is a missing or incorrect feedback of process relevant data, so that the planning results, gained by the use of information systems, differ to the current process situation.
The concept of Manufacturing Resource Planning (MRP II) still represents the central logic of production planning and control. However, the centralised and push-oriented MRP II planning logic is not able to plan and measure dynamic processes adequately, which, due to diverse disturbances, often occur in production environments. Furthermore, specific weaknesses of MRP II-based systems are the lack of support for order releases, the planning principle based on average values and the successive planning method as well as the use of limited partial models. As a result a successive planning method leads to a dissection of PPC-tasks into smaller work packages and so strides away from a holistic approach and the achievement of an optimal solution. Similarly, a planning, focusing on a general business objective system, using a partial planning approach due to isolated considerations is not possible. Insufficient consideration of the current load horizon and the current capacity utilization, non-existing or delayed feedback on order progress as well as faults and poor availability and transparency of information can be named as further weaknesses of MRP II-based systems.
Remote services are services enabled by information and communication components and therefore do not require the physical presence of a service technician at the service object to provide a task. The impact of remote service on the capital goods industry has been increasingly significant over the recent yeas. Still many companies struggle with developing and implemenling successful business model, for remote service. This leads to a lot of unaccomplished benefits for the customer as well as for the companies themselves. A survey throughout companies in Ihe industrial machine and plant production sector was conducted in order to determine what successful companies do differently from those that cannot efficiently implement remote service business models.
The study presented in this chapter identifies key suceess factors of companies that effectively implemented remote services for their products. In order to identify the successful companies a scale for measuring remote service success was developed. Only by the use of this scale further findings regarding the success factors were possible. Key findings include the fact that successful companies actively market their remotle service to their customers. Generally they try to approach their remote service business from the operating company's perspective.
Assets of integrated production systems, especially in the heavy industry, are facing high requirements in terms of reliability and availability. In case of component breakdown, the operating firm is confronted with high costs due to downtime and loss of production. Modern maintenance concepts in combination with advanced technologies can help to improve the plant availability and reduce the downtime costs caused by unplanned breakdowns. Against this background, the research institutes FIR and IMR from RWTH Aachen University, Germany, are collaborating within the research project “SiZu”. This project deals with the integration of condition monitoring system and real time simulation to assess the condition of components and to support failure cause analysis.
Holistic PLM- Model
(2010)
Product Lifecycle Management (PLM) is a widely discussed topic concerning the increase of efficiency of product development in terms of time to market as well as customizing products to the different needs of customers worldwide adequately. Historically PLM focuses the early phases of the product’s lifecycle, namely the product development phase. Therein the roots of PLM are based in supporting the information logistics of product data: Consistent data sets should be available to all stakeholders in the different departments at all times. Due to the increasing product complexity PLM has to be extended in terms of the temporal dimension (not limited to product development phase) and systemic dimension (not limited to the information logistic aspect). In this paper the authors derive a holistic framework for Product Lifecycle Management by analysing existing integrated management approaches. The framework consists of four dimensions: PLM strategy, PLM process, Product structure and PLM IT-Architecture. The sustainability and benefits of the framework is demonstrated by applying the framework to the communication service provider industry (CSP).
Industrial companies face tremendous challenges to plan the resources needed to meet future market demands when implementing a PSS based solution portfolio. This paper deals with enhancing the PSS research landscape by presenting an approach to enable better resource-planning in PSS based businesses. In particular, a model is proposed which links resource structures with customer offerings. Linkages are implemented, which connect resources and their use in processes. The model contributes to better understand the complexity in resource structures and elements in the PSS and helps to better understand and describe the structural integration of resources in PSS. This is an important prerequisite for the planning of PSS and allows a qualitative and quantitative description of the service resources allocation enabling companies to build the competence needed to meet customer requirements. A case study based approach was applied for model development.
Industrial Service Providers (ISP) are exposed to constantly raising competitive pressures regarding both cost and performance aspects. The massive challenges caused by the current worldwide financial and economic crisis even intensified the need for process optimizations aimed at increasing the productivity of service production. To reach this goal the evaluation and elimination of waste in their production processes becomes a crucial ability for ISPs. This paper proposes a new approach for increasing productivity in service production processes using a generic measurement model for the detection and evaluation of waste. The model is based on established lean management principles, but tailored to the specifics of ISPs by adopting a customers’ perspective to track down and eliminate waste. The evaluation builds on an in-depth-analysis of particular types of waste in the industrial service production processes. Viewed from the customers’ perspective and taking into account the specific characteristics of services (e.g. intangibility, heterogeneity, inseparability, and perishability) and service production (e.g. volatile demand, a tendency to over-capacity, and limits to planning) the approach employs a service blueprint reference model to then determine the different types of waste in the various parts of the service production process.
In the near future, tooling companies will offer their customers not just maintenance services, but complex remote service packages for their engineering asset management, which is the total management of physical – not financial – assets. The overall goal is to enhance the efficiency of the engineering asset, e.g. to reduce TCO, on the customers´ site by means of value creating partnerships. These partnerships may be, e.g. the classical output or reliability partnership, but also process optimizing partnerships or lifecycle partnerships. The process optimizing partnership offers, e.g. the optimization of the system’s performance or the output quality, an optimized ramp-up and restart procedure or optimization of the production process parameters. The lifecycle partnership, on the other hand, accompanies the intelligent tool-machine-system throughout the whole lifecycle, which includes, e.g. provision of spare parts during the entire usage phase, storing, refurbishment, recycling and even the support of relocation of production facilities. Intelligent remote services have great potential for realizing all these partnerships.
To realize such engineering asset-related partnerships, two major tasks have to be done. First, there has to be the intelligent tool-machine system, which delivers the information that is required for these services. And furthermore, this information has to be integrated into the maintenance processes, so that it is delivered at the right place and time and in the required form. Second, the activities and processes that are combined to the engineering asset-related partnerships have to be configured out of standardized service and process modules. Therefore configuration logic is essential.
Rebound Logistics
(2009)
Today, the flow of product returns is becoming a significant concern for many manufacturing companies. In this research area, three fundamental aspects of product returns need to be taken into consideration: First, companies become increasingly aware of the fact that product returns may offer an opportunity for enormous profit generation and for improving the competitive advantage of a manufacturing company when taking into account the accretive value of the products and technology. Second, the impact of green laws, legislative provisions and the increasing impact of a sustainable production management due to marketing aspects force companies to design and manage the reverse supply chain actively. Third, the importance of managing the reverse supply chains effectively will be enforced by the currently volatile economic climate. This paper outlines first results of designing a methodological framework for implementing an integrative reverse supply chain for manufacturing companies based on a type-specific Reverse Supply Chain Reference Model.
The House of Maintenance
(2009)
In order to guarantee an efficient and effective employment of production equipment, it is essential to identify any possible potential for improving performance, not only in the production process, but also in supporting areas such as maintenance. One of the major tasks in increasing maintenance performance consists of systematically identifying the company’s most significant weaknesses in maintenance organisation and thus being able to implement improvements there where they are most needed.
But how is a company to tackle this important task? To answer this question, this paper describes an assessment and improvement approach, based on a capability maturity model (CMM). By means of this approach, the status-quo of a maintenance organisation can be analysed and its individual improvement opportunities identified.